صافي توليد الكهرباء الحرارية الأرضية

10.43 (billion kilowatthours) in 2023

The amount of gross generation less the electrical energy consumed at the generating station(s) for station service or auxiliaries. Electricity required for pumping at pumped-storage plants is regarded as electricity for station service and is deducted from gross generation. Geothermal plant is a plant in which the prime mover is a steam turbine. The turbine is driven either by steam produced from hot water or by natural steam that derives its energy from heat found in rock.

التاريخ Value تغيير , %
2023 10.43 0.00 %
2022 10.43 4.08 %
2021 10.02 -6.89 %
2020 10.76 0.62 %
2019 10.69 2.45 %
2018 10.44 1.61 %
2017 10.27 -7.23 %
2016 11.07 0.24 %
2015 11.04 7.14 %
2014 10.31 7.32 %
2013 9.61 -6.29 %
2012 10.25